Found 10481 publications. Showing page 167 of 420:
Section 6.1 of the contract (BGD-3125 BGD-091066) between NORAD and NILU regarding Institutional Cooperation with the Bangladesh Ministry of Environment and Forest/Department of Environment (DOE) states that a progress report should be submitted semi-annually to NORAD. This report highlights the status of the project for the first six months of the project, August 2010 -January 2011. The project can be considered in good standing, with no major issues or deviations to report.
2011
Geographical dependence observed in blocking high influence on the stratospheric variability. NILU F
2011
Mesospheric intrusion and anomalous chemistry during and after a major stratospheric sudden warming. NILU F
2011
2011
2011
2011
2011
2011
2011
2011
E136 Breivika - Lerstad, Ålesund county. Evaluating air quality around openings of tunnels. NILU OR
Dispersion calculations regarding the tunnel connections along E136 Breivika - Lerstad, Ålesund county. Maximum concentrations and dispersion distances have been calculated.
2011
2011
2011
2011
2011
2011
2011